New Parliament Parking Lot Closed Down For Two Days Over Floods

Date:

Share post:

The Parliament parking lot which cost about Shs36 billion and can accommodate 510 cars was last week closed down for two days over floods.

The Daily Monitor reports that authorities in Parliament said the lot was flooded due to the rains that poured last week and the area had leakages.

However, the Parliament cleaners were immediately dispatched to the South Wing to shove water using buckets and rags, until a contractor, M/s Seyani and Brothers Limited, was called to come and fix the problem.

The lot was re-opened on Tuesday.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

spot_img

Related articles

Uganda Restores Internet and Social Media After 11-Day Election Blackout

The Government of Uganda has fully restored internet and social media access following an 11-day nationwide shutdown imposed...

Breaking: Hon. Dr. Fred Mukasa Mbidde Speaks Out After Latest Election Defeat in Buwekula

Kampala, January 26, 2026 – Veteran Ugandan politician and lawyer Hon. Dr. Fred Mukasa Mbidde has suffered yet...

Katikkiro Charles Peter Mayiga Reflects on Uganda’s AFCON Struggles: “Lack of Inspiration Holds Back the Cranes”

Uganda’s national football team, the Cranes, endured a disappointing campaign at the Africa Cup of Nations (AFCON) in...

Uganda Braces for Presidential Election as Bobi Wine Calls for Protest Vote

Kampala Uganda: Uganda is heading into a tense presidential election next week as opposition leader Robert Kyagulanyi Ssentamu,...